采用純丙烯酸特細(xì)料徑樹脂,高滲透性,有效抗堿,防止涂膜返堿變色/良好的封
閉性,防止水汽滲透/有效防止霉菌孳生/提高涂膜豐滿度及均勻度/有效滲入墻體,加固
基層,附著力強(qiáng),/易施工配方/干燥快,便于重涂。
【適用范圍】
廣泛適用于墻體,天花,石膏板,頂棚,水泥基材等裝飾與保護(hù)。
【建議配套系統(tǒng)】
康典配套底漆。
【理論涂刷面積】
理論上,1L該產(chǎn)品可以涂刷13-16m2(以30um漆膜計(jì))。
實(shí)際涂刷面積會(huì)因施工方法及表面粗糙程度會(huì)有所
差異。
【施工指南】
·干燥時(shí)間:表干時(shí)間約30分鐘,重涂時(shí)間>2小時(shí)。(溫度25℃,相對(duì)溫度<75%。)
·基材要求:清潔,平整,干燥,無疏松及空鼓現(xiàn)象,含水率<10%,PH<10。新墻體
夏季需養(yǎng)護(hù)15天以上,冬天需養(yǎng)護(hù)25天以上。
涂裝體系:基材 刮涂膩?zhàn)?遍 刷涂抗堿封閉底1遍
面漆2遍(根椐基材和施工要求不同,可適當(dāng)調(diào)整)
·施工方法:刷涂,輥涂,無氣噴涂。
·稀釋比列:用25%-30%清水稀釋,噴涂兌水<10%
·施工環(huán)境:溫度在5℃以上,空氣濕度<85%以下環(huán)境施工,作業(yè)場地應(yīng)保持通風(fēng)和
透氣。
符合國家標(biāo)準(zhǔn):GB/T9755-2001 GB/T9756-2001
【儲(chǔ)存保質(zhì)期】
置于陰涼,干燥,通風(fēng)處,防直曬,避免兒童接觸。在5℃-35℃庫存內(nèi)儲(chǔ)存,保質(zhì)期
見合格證。
Extra-fine pure acrylic resin material diameter, high permeability, the effective alkali, to prevent the film back to base color / sound seal
Closed, to prevent moisture penetration / prevent mold breeding / enhance fullness and evenness of coating / effectively penetrate the walls, reinforced
Grass-roots, adhesion, and / Construction formula is easy / fast drying, easy to recoat.
The scope of application
Widely used in wall, ceiling, gypsum board, ceiling, cement and other decorative and protection of the substrate.
Supporting system】 【proposed
WellPoint matching primer.
Brushing area】 【theory
In theory, 1L the product can be painted 13-16m2 (to 30um paint film).
Construction of the actual area will be brushing method and surface roughness will be
Differences.
】 【Construction Guide
* Drying time: about 30 minutes dry time, re-coating time> 2 hours. (Temperature 25 ℃, relative temperature "75%.)
* Substrate requirements: clean, flat, dry, loose and hollowing phenomenon, moisture Need to conserve more than 15 days in summer and winter maintenance required 25 days or more.
Coating system: substrate Scratch brushing putty 2 times 1 times alkali closed bottom
Finish 2 times (noted in the substrate and construction requirements are different, can be properly adjusted)
* APPLICATION: Brush, roller, airless spray.
* Dilution ratio line: with 25% -30% water dilution, spraying dilute water <10%
* Construction environment: temperature above 5 ℃, air humidity "85% of the following environment construction, operation sites, and ventilation should be maintained
Ventilation.
Meet national standards: GB/T9755-2001 GB/T9756-2001
【Storage Shelf life
Store in a cool, dry, ventilated place, anti Zhishai, to avoid the reach of children. At 5 ℃ -35 ℃ storage of inventory, shelf life
See certificate.